Mercedes M-Class W163

since 1997 release

Repair and operation of the car



Mercedes W163
+ Mercedes-Benz cars of a class M (W163)
+ Governing bodies and methods of safe operation
+ Current leaving and service
+ Engine
+ Cooling systems, heating and air conditioner
- Power supply system and production of the fulfilled gases
   + Power supply system of petrol engines
   - Power supply system of diesel engines
      General information
      Checks of system of injection of fuel
      Service of components of an inlet air path
      Service of components of the drive of a butterfly valve
      Depletion of the fuel tank
      Removal and installation of the sensor of a reserve of fuel
      Removal of air from a contour of low pressure of a fuel path, - on the example of the series 612 engine
      Removal and installation of the preliminary fuel pump
      Removal and installation of the fuel pump of high pressure (FPHP)
      Removal and installation of the fuel distributive highway and nozzles
      Removal and installation of the sensor of pressure in the fuel highway
      Removal and installation of the electric locking valve, - model 163.113
      Removal and installation of the valve regulator of pressure of fuel
      Removal and installation of valvate assembly on models 163.128
      Removal and installation of a cooler of fuel on models 163.113
      Removal and installation of the module of management of fuel injection
      Removal and installation of the fuel tank
   + Systems of release and decrease in toxicity of the fulfilled gases
+ Systems of electric equipment of the engine
+ Manual box of gear shifting
+ Automatic transmission
+ Transmission line
+ Brake and auxiliary systems
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment




Removal and installation of valvate assembly on models 163.128

Details of installation of valvate assembly on models 163.128 (the series 628 engine)


 PERFORMANCE ORDER

  1. Details of installation of valvate assembly on models 163.128 (the series 628 engine) are shown on an illustration to which all references which are found in the text belong.
  2. Remove the air distribution pipeline (see the Section Service of Components of an Inlet Air Path).
  3. Remove the fuel filter assembled with a basic arm (see the Head of the Power supply system and production of the fulfilled gases).
  4. Disconnect an electrical wiring from pressure sensors in the fuel highway (B4/6) and the valve regulator of pressure (Y74).
  5. Disconnect pressure head fuel lines (1, 2 and 3), - at once to a zakuporta the open ends of the disconnected lines/unions, collect traces of the spilled fuel.
  6. Turn out a hollow bolt (4) of the nipple socket (5).

Sealing rings are subject to replacement without fail!

  1. Remove the valvate block (9) from the distributive pipeline of an air path, previously having disconnected from it the returnable line (8).
  2. Installation is made upside-down, - do not forget to replace sealing elements (6, 7), start the engine and check power supply system components for existence of signs of development of leaks. In conclusion make cleaning of memory of the module of onboard self-diagnostics (see the Head Sistemy of electric equipment of the engine).